Simulation Period

The simulation period is generally defined by specifying the required Simula­tion start date and time and Simulation end date and time.

Date and time can be edited manually by clicking the start date or end date field and change the date (Year+Month+Day) and time (hour+minutes+sec­onds). In this case it is possible to use the right and left arrow keys to navi­gate between the date and time variables.

Alternatively, dates can be selected using the calendar icon; DateSelectionButton.png, which will open a calendar that allows to browse for the required date (see Figure 4.3). Note, that the simulation time will still have to entered manually after choos­ing a date from the calendar date selection.

DateSelectionCalendar.png 

Figure 4.3           Calendar date selection option for simulation periods

Note that it is possible to use input time series for model input parameters, which have different length than the simulation period, and different temporal resolution than the simulation time step.

If an input time series does not cover the entire simulation period it must cover a period of at least one calendar year when the simulation period is longer than a year. If an input time series covers exactly one year it will be recycled using the appropriate values for the simulation period, both for the period

If the input time series is longer than a year, input data from the first full year will be used for the simulation period before data exist, and input data from the last full year will be used for the simulation period after data exists.

The `Apply default' button can be used to extract the possible simulation start-time and end-time. Once the button is activated a search of time-inter­vals in all time series files included in the actual simulation takes place and the earliest possible start-date and latest possible end-date is automatically transferred to the date-fields.

note00003.jpg 

Note: If no dates are proposed from activating the button the most likely rea­son will be that there are no overlapping time series in the setup.