When running a steady-state simulation that includes SZ-river exchange, a constant water depth may be specified for the river network, which can be used to calculate the head gradient driving the exchange flow.
If a constant river water depth is not specified, then the river water levels are determined in the following order
1. MIKE SHE hot-start water level, if MIKE SHE hot-start is specified
2. Initial water levels from MIKE Hydro River, if the MIKE Hydro River coupling is used